Maintenance
9.2 Maintenance overview GMK 4100, GMK 4100-L
9 - 2 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
9.2 Maintenance overview GMK 4100, GMK 4100-L
9.2.1 Maintenance plan M 1
9.2.2 Maintenance plan M 12
M 1
Lattice extension maintenance work:
monthly / after 100 operating hours
Lubricant
1)
in litres (gal)
Swing-away lattice
Lubricate pins;
à p. 9 - 5. J
Boom extension
Lubricate pins;
à p. 9 - 5. J
Auxiliary single-sheave boom top and heavy load lattice exten-
sion
Lubricate pin;
à p. 9 - 6. J
1)
à Lubrication chart in the Maintenance manual of the truck crane
delivered
M 12
Lattice extension maintenance work:
every 12 months / after 1,000 operating hours
Lubricant
1)
in litres (gal)
Swing-away lattice
Lubricate joints;
à p. 9 - 6. J2
1)
à Lubrication chart in the Maintenance manual of the truck crane
delivered