EasyManua.ls Logo

Manitowoc GROVE GMK 5095 - Rigging Work Checklists; Overview of the Required Rigging Work

Manitowoc GROVE GMK 5095
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Swing-away lattice
3.3 Rigging work checklists
Lattice extension operating instructions 3 112 441 en 3 - 7
GMK 4100/4100-L/5095
11.01.2008
3.3 Rigging work checklists
3.3.1 Overview of the required rigging work
There are different initial conditions for rigging the swing-away lattice,
depending on whether the swing-away lattice is:
Folded on the side of the main boom or
Removed for on-road driving.
You can find out which checklist describes the required rigging work for
your initial condition in the following table.
1)
Details on the driving mode à Operating instructions GMK 4100/4100-L/
5095 – driving modes
.
Initial condition of the
swing-away lattice
Corresponding
checklist for ...
Before
crane oper-
ation
On the side of the main
boom
à Rigging; p. 3 - 15
Completely removed
à Installation; p. 3 - 8
After crane
operation
To be folded on the side of
the main boom
à Unrigging; p. 3 - 21
To be removed for on-
road driving
à Removal
1)
; p. 3 - 10

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Related product manuals