Swing-away lattice
3.3 Rigging work checklists
3 - 8 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
3.3.2 CHECKLIST: Installing the 10 / 17 m (33 / 56 ft) swing-away
lattice
H
This checklist is no complete set of operating instructions. There are accom-
panying operating instructions which are referred to by cross-references.
Observe the warnings and safety instructions specified there.
Prerequisites:
The truck crane is on outriggers or the main boom has been set down on
the boom rest.
An auxiliary crane is available.
1. For the derricking swing-away lattice, release the locking device on the
hose drum;
à p. 3 - 33.
2. Check whether the transport condition of the swing-away lattice has
been established;
à Transport condition with removed swing-away lattice,
p. 3 - 29.
3. Sling the swing-away lattice onto the auxiliary crane and attach the
guide rope to the front of section 1;
à Slinging points, p. 2 - 5.
4. Raise the swing-away lattice and pin section 1 to the right-hand side of
the main boom;
à p. 3 - 49.