Swing-away lattice
3.4 Description of the rigging work
3 - 52 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
Rigging
Rigging position
Open the valve (1).
Place the lever (2) in position (A).
Press the pull rod (3) manually as far as it
will go in direction (B).
Close the valve (1).
Swivel the swing-away lattice in front of the
main boom head.
In end position, the pull rod (3) falls onto the
hook (4).
Establishing connections
Fit the pin into the connecting point (3) and
secure it.
Move the lever (1) forward and back again.
The ram of the hydraulic cylinder (5) is
extended. Move the lever (1) until the bores
on the connecting point (4) align.
Fit the pin into the connecting point (4) and
secure it.
Open the valve (2).

Table of Contents

Other manuals for Manitowoc GROVE GMK 5095

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 5095 and is the answer not in the manual?

Manitowoc GROVE GMK 5095 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 5095
CategoryConstruction Equipment
LanguageEnglish

Related product manuals