61
11921 Slauson Ave.  Santa Fe Springs, CA.  90670  (800) 227-4116  FAX (888) 771-7713
150 AMP
CIRCUIT 
BREAKER
MASTER 
DISCONNECT
SWITCH
FIG. 61-2
FIG. 61-3
3. If Liftgate comes with:
• Single Pole Tractor Charge Line Kit
• Single Pole Trailer Charge Line Kit
• Dual Pole Tractor Charge Line Kit
• Dual Pole Trailer Charge Line Kit
  Install charge line according to
Instruction Sheet contained in
each kit. 
1. Install charge line by running the 
line along vehicle frame 
 as follows.
  • Inside of truck frame (FIG. 61-1) 
  • Bottom of trailer frame
2. Run the charge line from truck bat-
tery or nose of trailer to one of the 
following devices.
  • Master disconnect switch on  
    pump box (FIG. 61-2) 
  • The 150 amp circuit breaker in 
    optional battery box (FIG. 61-3)
  Use frame clips (Parts Box item) 
(FIG. 61-1) and plastic ties, as 
required from charge line kit, to 
secure cable to vehicle. 
NOTE: Make sure cable is long enough to reach master disconnect switch on Lift-
gate pump box, or circuit breaker in optional battery box (if equipped), without 
putting strain on the cable. If equipped with fused cable, ensure the fuse end 
is by the vehicle battery.
STEP 10 - RUN CHARGE LINES - Continued
RUNNING CABLE FROM VEHICLE BATTERY
FIG. 61-1
VEHICLE 
FRAME
18” - 24”
SPACING
CHARGE LINE TO 
PUMP BOX OR 
BATTERY BOX
FRONT OF VEHICLE
REAR OF VEHICLE
CHARGE LINE 
TO VEHICLE 
BATTERY
FRAME 
CLIPS