Installation
Rev 2.2
43Mellanox Technologies
The following parts are included in the rail kit (see Figure 34):
1 metal frame for two systems (A)
2 system mounting blades with 8 screw holes - the kit contains enough rails to install 2
systems (B)
2 system mounting blades with 7 screw holes - the kit contains enough rails to install 2
systems (C)
2 blank (installed) covers (D)
30 flat head 4-40 screws - the kit contains enough screws to install 2 systems (E)
2 frame rail slides (F)
10 (+2 spare units) M6 pan head screws (G)
10 (+2 spare units) M6 spring washers (H)
10 (+2 spare units) M6 spring steel cage nuts (I)
6 (+2 spare units) cable-ties (J)
Table 10 - Installation Kit
Kit OPN Rack Size and Rack Depth Range
MTEF-KIT-D Rack installation kit for SN2100/SN2010 series short depth 1U switches,
allows installation of one or two switches side-by-side into standard depth
racks

Table of Contents

Other manuals for Mellanox Technologies Spectrum SN2010

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mellanox Technologies Spectrum SN2010 and is the answer not in the manual?

Mellanox Technologies Spectrum SN2010 Specifications

General IconGeneral
BrandMellanox Technologies
ModelSpectrum SN2010
CategorySwitch
LanguageEnglish

Related product manuals