EasyManua.ls Logo

Microtest 8740 - Comprehensive Test Implementation; Real-Time Test

Microtest 8740
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
4.2 Comprehensive Test Implementation
After the settings above are completed, comprehensive test implementation can be performed. Since the
operating procedures are different, it can be divided into two types: Real Time Test and Existed Test;
individual descriptions are as follows:
4.2.1 Real-time Test
This part set the test conditions saved in the main memory as the test condition and performs test to DUTs
in real time. It is the most commonly used test method. Its step descriptions are as follows:
(1) First check whether the test condition settings are correct.
(2) Press [Mode] to display the test mode setting screen.
(3) Check and confirm whether the test mode settings are correct, and change according to your needs.
(4) After confirming there are no errors, press [EXIT] to exit and return to the main screen.
(5) Press [TEST] to start testing.
(6) When the test is complete or if the test needs to be interrupted, please press [EXIT] to exit.

Related product manuals