EasyManua.ls Logo

Minebea Intec PR 5310 - Checking the Equipment Supplied; Acclimatizing the Device; Cable Gland and Cable Connection

Minebea Intec PR 5310
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Device installation | 4.2 - Mechanical preparation | 30
4.2.4 Checking the equipment supplied
Indicator
Options and accessories in accordance with the delivery note
Safety instructions
4.2.5 Acclimatizing the device
If a cold device is brought into a warm environment, condensation may form.
Keep the device disconnected from the mains and allow it to acclimatize
at room temperature for approx.twohours.
4.2.6 Cable gland and Cable connection
The cable conductors for the weighing electronics board are placed on the
terminals in the device.
The wires leading to the terminals should be kept as short as possible.
Panel device
Have all required parts, technical documents and tools at hand for control
cabinet installation.
Other procedure:
Make the control panel cut-out for the device in the control cabinet door,
see ChapterControl panel housing.
Install the device.
Secure the cable at the place of installation, e.g. using cable ties.
Remove the insulation from the cable ends and keep the strands short.
Connect the screens to the grounding terminal; see ChapterEMC-compli
ant installation.

Table of Contents

Related product manuals