57 MPSYSTEMS-M-001/06
9.6.5. Priming & Start-Up
R Series vertical reservoir must be
filled before RC unit can be primed;
Ensure outlet hose for circulation
pump has been firmly fastened;
Open 1” ball valve leading from R
Series reservoir to 1HP circulation
pump;
o Gravity will force fluid into
circulation pump.
Priming is complete;
Re-attach side panel;
RC mountable chiller is ready to run.
Fill
Here
Open
Fasten