EasyManuals Logo

MST Impact NS5001 User Manual

MST Impact NS5001
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #127 background imageLoading...
Page #127 background image
NS50 wireless network switch
User Manual
Revision C
Appendix G: Maintenance Check List
© 2012 MST Global
Commercial in Confidence
117
Testing RF RX path for WAC 1
3.
Stand 50M away from the IMPACT NS50 with two MST RFID
tags.
4. Open NS50 web browser interface and select the STATUS >
TAGS web page.
5. Verify that the two tags have been detected by the network switch
and check the received signal strength is within specification (Refer
to commissioning data).
Testing RF RX path for WAC 2
1.
Stand 50M away from the IMPACT NS50 with two MST RFID
tags.
2.
Open the NS50 web browser interface and select the
STATUS
>
TAGS
3.
web page.
4. Verify that the two tags have been detected by the network switch
and check the received signal strength is within specification (Refer
to commissioning data).
Ingress
Open the front cover and check inside for water and dust.

Table of Contents

Other manuals for MST Impact NS5001

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MST Impact NS5001 and is the answer not in the manual?

MST Impact NS5001 Specifications

General IconGeneral
BrandMST
ModelImpact NS5001
CategorySwitch
LanguageEnglish

Related product manuals