EasyManua.ls Logo

Mueller SENTRY II - Milk Room Installation Considerations

Mueller SENTRY II
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.10 Milk Room Installations
Ensure proper clearances between the milk cooler and other obstacles or equipment as required by the
regulations in your locality. Special attention should be placed on floor drain locations, high-traffic and
working areas, and ease of access for the operators.
The milk cooler parts box includes two stainless steel brackets to secure the water/chemical fill line to
the rear head of the milk cooler, Part Nos. 8823254 (top) and 8823253 (bottom). Each bracket is
supplied with 1.125" rubber grommets, which provides a method to support the water/chemical fill
hose inside of .75" PVC conduit. See Figure 7.
Figure 7 - Milk Room Installations
Sentry II with Auto-Dosing Assembly Operating Instructions 8 Effective April 1, 2000

Table of Contents

Other manuals for Mueller SENTRY II

Related product manuals