IOM-EZVAVINST
Date: 10-2016 Supersedes: 7-2016
Nailor reserves the right to change any information concerning product or specification without notice or obligation.
Page 27 of 48
Installation and Operation Manual
●
EZvav Digital Controls
Theairowbalancingprocedure(connue)
PROCEDURE STEPS STEDISPLAY
8 Advance or exit.
1. Press the
∆
or buons to select one of the
following:
• PRI to balance the primary VAV for dual duct
systems
• BACK to choose another conguraon funcon.
• EXIT to return to the temperature display.
2. Press the
buon to select the next funcon.
∆