Maintenance
5-1
Part 1089210A04
E 2010 Nordson Corporation
Section 5
Maintenance
WARNING: Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Establish acceptable curing levels for your process and then develop a
maintenance schedule that fits your needs. Radiometers can be used to
measure relative readings for spectral output as a means of monitoring
spectral intensity.
The maintenance and replacement schedule for the system will depend
upon your:
S application process
S plant environment
S quality of cooling air passing through the system
S coating formulation
Power Supply Maintenance and Repair
Maintenance Schedule
Recommended maintenance for the power supply consists of cleaning or
changing the cooling air filters and removing dust from the power supply.
Power Supply Repair Procedures
Preparation
1. Turn off the UV system from the process equipment controller or at the
power supply panel.
2. Allow the lamphead fan to complete its cooling cycle. If this has been
prevented by premature isolation of the control cabinet, always allow
sufficient time for the bulb to cool before proceeding.
3. Turn off the main electrical disconnect. Follow all relevant OSHA
established lockout procedures or local codes as appropriate.