EasyManua.ls Logo

Nortel AccessNode 2016 - Page 171

Nortel AccessNode 2016
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ordering information
6-35
User Guide Rel 1.0 Standard May 1999
P0891308 Fan shelf faceplate 2
NT1W10AA Shelf separator assembly 1
NTNR90CA BIP #3 power distribution cable assembly, shelf 1-7 1
NTNR90DA BIP #3 Talk battery cable assembly, shelf 1-7 1
NTNR82ED ABM #3 CDS 4 A/B link cable assembly 1
NTNR82EE ABM #3 CDS 5 A/B link cable assembly 1
NTNR82EF ABM #3 CDS 6 A/B link cable assembly 1
NTNR82EG ABM #3 CDS 7A/B link cable assembly 1
NT4K86NB Shelf metallic test pair cable assembly, 3 ft long 1
NT4K86NC Shelf metallic test pair cable assembly, 8 ft long 1
Cables, assemblies and kits to order
NTNR91AC BIP # 3 power cable assembly 1
NT7E44JC CNet bay cable provides communication links between ABM
shelves
1
NTNR80AA 14 pair cable assembly provides DS1 connectivity between
AccessNode and DSX panel
2
P0902427 Cabinet label kit 1
Required options to order
B01231144 NT5C06CA-3 MPR 25 rectifier module (see Notes 1 and 2) 1 or 2
Note 1:
Insert appropriate number of modules into rectifier shelves NT5C10CP-61 part of NTNR21AA.
Note 2:
Four modules total are required for 2016 lines + (1) for redundancy.
Note 3:
Refer to “Optional battery backup” on page 6-45 for ordering battery string hook up cables,
required when the battery compartment holds the battery backup.
Note 4:
Refer to Optional remote monitoring unit” on page 6-44 for ordering RMU test access path
cable when optional RMU NTNR35AA is selected. A cable must be ordered for each additional AN ABM
NTNR10AA.
—end—
Table 6-12 (continued)
1344- to 2016-line expansion kit equipment (standard) for AN2016 Cabinet
PEC Description Quantity

Table of Contents

Related product manuals