EasyManua.ls Logo

OHAUS Explorer Balances - Page 39

OHAUS Explorer Balances
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3 - MAINTENANCE PROCEDURES
Explorer
®
Series Service Manual 33 Ohaus Corporation www.ohaus.com
InCal cable routing Non-Draftshield models:
Item
Part No.
编号
Description
Qty
Item
Part No.
编号
Description
Qty
Item
Description
Qty
1 12121177
Metal Clip
1 1
Stactic strip
1
2
Nipper
1 S/N Dept.
QTY.
1
2
3
S/N Dept.
Station code
1
2
3
1st Version Ying Qi A 9/1/2010
DOCUMENT NUMBER
编号
:
PRODUCT FAMILY
:
PRODUCT MODEL
:
VISUAL Assembly WI
视组装
EX
Hard copy
Process
Originator
Tooling and Equipment
设备
Material PREPARED BY :
Ying QI
WI Request: 1.Material; 2.Tools&Equipment; 3.Process description; 4.Picture; 5.Notice; 6.Scope; 7.Version; 8.Originator&Effective date,
Category of distribution
发类
APPROVED BY :
Paperless
Explorer
Explorer
PROCESS :
HISTORY TRACKING
OF VISUAL AID
CHANGES
记录
OPERATION TITLE
:
5.Connect the incale cable with the interface. 6.Use the metal clip to fix the cable in the cut of the bottom.(no small foot side must be outside)
SHEET
页码
:
1 of
EHS(
)
:N/A
DOCUMENT
REVISION
ISSUE DATE
Assem bly
Notice:Non small foot side of the clip must be outside or the
cable will not be fixed in the cut because of the size.
Notice
:
5
6
Clip
incale cable
incale cable
Nipper
small foot side
non small foot side
clip non small foot side outside
Item
Part No.
编号
Description
Qty
Item
Part No.
编号
Description
Qty
Item
Description
Qty
1
Stactic strip
1
2
Nipper
1 S/N Dept.
QTY.
1
2
3
S/N Dept.
Station code
1
2
3
1st Version Ying Qi A 9/1/2010
DOCUMENT NUMBER
编号
:
PRODUCT FAMILY
:
PRODUCT MODEL
:
DOCUMENT
REVISION
ISSUE DATE
Assem bly
Notice
:
SHEET
页码
:
1 of
EHS(
)
:N/A
Explorer
Explorer
PROCESS :
Material PREPARED BY :
Ying QI
Paperless
HISTORY TRACKING
OF VISUAL AID
CHANGES
记录
Originator
OPERATION TITLE
:
VISUAL Assembly WI
视组装
EX
Hard copy
Process
WI Request: 1.Material; 2.Tools&Equipment; 3.Process description; 4.Picture; 5.Notice; 6.Scope; 7.Version; 8.Originator&Effective date,
Category of distribution
发类
APPROVED BY :
7.Put the cable into the slot using nipper and make sure the cable not cover the screw hole
8.Pull the cable out of bottom and bend at about 6cm.
Tooling and Equipment
设备
7
8
Nipper
loadcell cable
Bending line
screw hole

Table of Contents

Related product manuals