8 Installation
Page 42
Installation manual PMCprimo Drive2
8.4.6 Notes on connection techniques
Shielding connection to the front panel:
Remove the outer covering of the
cable and the shielding braid from
the cores for the required length.
Secure the cores with a cable tie.
Remove the outer covering of the
cable over a length of about
30mm, without damaging the
shielding braid.
Pull a cable tie through the slot in
the shielding rail (front panel) of
the PMCprimo Drive2.
Use the cable tie to clamp the
shielding braid of the cable firmly
to the shielding rail.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pilz PMCprimo Drive2 and is the answer not in the manual?

Pilz PMCprimo Drive2 Specifications

General IconGeneral
BrandPilz
ModelPMCprimo Drive2
CategoryDC Drives
LanguageEnglish