EasyManua.ls Logo

Precor TRM10/GEN06 - Preventative Maintenance Checklist (Facility Personnel); To be Done Daily; To be Done Weekly: All of the above Plus; To be Done Monthly: All of the above Plus

Precor TRM10/GEN06
149 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law Page 133
Preventative Maintenance Checklist (Facility personnel)
(To be done by the facility personnel)
To Be Done Daily:
Turn off and unplug the unit.
Visually inspect the deck and belt.
Wipe down the deck and belt with a dry cloth.
All outer surfaces of the unit are clean
Inspect the power cord.
To Be Done Weekly: All of the above plus
Elevate the unit to maximum incline and remove power.
Totally clean the environment around and under the machine.
Re-connect power and turn the unit on.
Perform the "Running Belt and Deck Cleaning Procedure"
To Be Done Monthly: All of the above plus
Remove the power from the unit.
Clean the outer surfaces of the unit, and scrub the top surface of the belt.

Table of Contents