EasyManua.ls Logo

ProMinent DULCOMETER D1Cc - Testing the Redox Sensor

ProMinent DULCOMETER D1Cc
155 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.5.4 Testing the Redox Sensor
CAUTION!
Correct sensor operation / Run-in time
Damage to the product or its surroundings
Correct measuring and metering is only possible if the sensor is working per‐
fectly
Please read the operating manual for the sensor
It is imperative that the run-in times of the sensors are adhered to
The run-in times should be allowed for when planning initial operation
NOTICE!
Testing the Redox Sensor
With redox measured variables, the sensor is not calibrated but tested according to
its design
Observe any notification of abnormal behaviour when testing the redox sensor
Should the test not be successful, replace the redox sensor
= automatic timing
check sensor
ORP
check sensor
ORP
sensor in buffer r
460 mV
check sensor
measuremactive
please wait!
check sensor
ORP
mea. val
buffer
460 mV
465 mV
permanent display 1
A0064_GB
460 m
V
Fig. 45: Testing redox sensors
8.5.4.1 Description of the Testing
of Redox Sensors
A container with a redox buffer solution
(e.g. 465 mV) is needed for testing.
1.
Select the Test menu
Measured Variables and Operating Menus for Potentiometric Sensors
92

Table of Contents

Related product manuals