EasyManuals Logo

Quectel EC25 User Manual

Quectel EC25
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #92 background imageLoading...
Page #92 background image
LTE Module Series
EC25&EC21 AT Commands Manual
EC25&EC21_AT_Commands_Manual 91 / 231
Parameter
1. This command may be aborted generally by receiving an ATH command or a character during
execution. The aborting is not possible during some states of connection establishment such as
handshaking.
2. Parameter “I” and “i” can be omitted only when there is no “* or # code within the dial string.
3. See ATX command for setting result code and call monitoring parameters.
4. Responses returned after dialing with ATD
For voice call, two different responses mode can be determined. TA returns OKimmediately either
after dialing was completed or after the call was established. The setting is controlled by AT+COLP.
Factory default is AT+COLP=0, which causes the TA to return OK immediately after dialing was
completed. Otherwise TA will return OK”, “BUSY”, “NO DIAL TONE”, or NO CARRIER”.
5. Using ATD during an active voice call:
When a user originates a second voice call while there is already an active voice call, the first
call will be automatically put on hold.
The current states of all calls can be easily checked at any time by using AT+CLCC command.
Example
ATD10086; //Dialing out the party‟s number
OK
NOTES

Table of Contents

Other manuals for Quectel EC25

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quectel EC25 and is the answer not in the manual?

Quectel EC25 Specifications

General IconGeneral
CategoryLTE Module
LTE TDDB38/B40/B41
WCDMAB1/B5/B8
GSM850/900/1800/1900 MHz
Data ratesLTE Cat 4: 150 Mbps DL/50 Mbps UL
GNSSGPS/GLONASS/BeiDou/Galileo/QZSS
Operating Temperature-40°C to +85°C
Form FactorLCC
Storage Temperature-45°C to +90°C
SIM Interface1.8V/3.0V
Antenna InterfaceMain, Diversity, GNSS
LTE FDDB1/B3/B5/B7/B8/B20
InterfacesUSB 2.0, UART, PCM, GPIO
Operating Voltage3.3V - 4.3V
ProtocolsTCP/IP, UDP, FTP, HTTP, HTTPS
CertificationsCE, FCC, PTCRB, GCF, RCM, IC

Related product manuals