EasyManua.ls Logo

Ramtech WES3 - Moving a Unit on Site; Removing a Unit from the Site

Ramtech WES3
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 32 WES
3
Installation and Operations Manual V2.0 Ramtech Electronics Limited 2020
After moving a unit, we recommend that you conduct a system test
to check that the movement has not adversely affected radio
communication.Ensureanysitereplansareupdatedwithany
revisions to WES
3
unit numbering and location.
Beforeshippingaunitormovingittoanothersiteitmustrstbe
deactivated, in order to:
• prevent accidental triggering
• preserve battery unit life
• clear site information which would prevent it forming or joining
another site
First,removetheunittobedeactivatedfromthewall/ceilingand
ensure the back tamper button is not pressed in.
Hold down ‘A and then press ‘B’ three times in quick succession. All
threeLEDswillbrieyilluminateandthenswitchoff.
Note:unitscannotbedeactivatedwhilearealarmisactive.
Moving a Unit on Site
Removing a Unit from Site

Table of Contents

Other manuals for Ramtech WES3

Related product manuals