EasyManua.ls Logo

Ridder RB50EPLUS - Installation - Conditions and starting points

Ridder RB50EPLUS
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 Installaon - Condions and starng points
Ridder components
The starng point is that only Ridder components are used.
Roller-screen system
The starng point is a side-wall roller-screen in a greenhouse. The roller screen is installed on
a side wall between the purlins. For dierent installaons, systems, greenhouses and building
structures this product manual does not give full informaon.
Standard installaon (tube motor 550032/550039)
The starng point is the standard installaon of a tube motor 550032 or 550039.
For dierent installaons refer to “ALTERNATIVES”.
The guiding unit (550500) is for the standard VK10 journal.
The tube of the 550039 tube motor has an extension of 74 mm. This makes the RB50Eᵖˡᵘˢ tube
motor interchangeable with the RB50 tube motor.
Installaon side of the roller screen
The installaon is possible on the two sides of the roller screen (20).
If installaon on the other side of the roller screen (20) is necessary:
Turn the assembly 180° around the longitudinal axis of the post (B).
Note: In §4.3 thru §4.7 each me the same installaon side is shown.
550032
550039
4.2.1VK10 (standard installaon)
4.2.2
Put the cable-carrier bracket (8) and tube motor (1) in the correct
posion for the related installaon side of the roller screen.
REFER TO §4.4/4.5. This prevents more subsequent work.
Ridder Drive Systems
T +31 (0)341 416 854 F +31 (0)341 416 611 I www.ridder.com
10

Related product manuals