EasyManua.ls Logo

ROBOTIQ PE20 - Inspection

Default Icon
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PowerPick20 also includes a shut off valve that can alternatively depressurize the system downstream and be locked in the exhaust
position. In the latter case, the upstream section remains pressurized.
To turn off the electrical power downstream of the Robotiq Control Box, switch the main isolator off and lock it in the off position.
It is also possible to unplug the main power cable from the power outlet.
CAUTION
Follow these 4 electrical engineering safety rules when working on electrical equipment:
l
Disconnect completely
l
Secure against reconnection
l
Make sure there is no voltage
l
Provide protection against adjacent live components
7.2.Inspection
WARNING
Failure to perform the following inspection at the specified interval can result in material damage,
death or serious injury.
Failure to repair defective items before putting the equipment back into operation may result in
material damage, death or seriousinjury.
Prior to performing the inspection of the equipment, the power off and lock out procedure must be
followed. Please refer to the Power Off and Lock Off Procedure section for more information.
The following inspection procedure should be performed at regular 350-hour intervalsof equipment usage.
If issuesare identified during the inspection procedure, the damaged or otherwise worn elements must be replaced or repaired
before putting the equipment back into operation.
7.2.1.PE20 PalletizingSolution
The torque required for all fasteners mentioned in thissection is specified in FastenersSpecificationssection.
Anchor Points
l
Inspect the four (4)anchor pointsat each corner of the Solution.
l
Make sure the fasteners are present and tightened to the appropriate torque.
116

Other manuals for ROBOTIQ PE20

Related product manuals