84 Rockwell Automation Publication 750-RM004A-EN-P - April 2018
Chapter 1 Selection Considerations
Figure 22 - PowerFlex 755TL/TR Frame 8…9 Drive Power Terminal Locations
Item Name Description
1 AC Link Connects AC circuit breaker to LCL fuse assembly
2 Testpoints DC+, DC- and R/L1, S/L2, T/L3 voltage testpoint sockets
3 Control Bus 120/240V and 24V AC control power supply connections
4 Power Bus R/L1, S/L2, T/L3 AC line input power connections
5 Power Bus U/T1, V/T2, W/T3 motor connections
6PE Grounding
Bar
Terminating point to chassis ground for incoming AC line
and motor shield.
PE ground bar clamps, kit number SK-RM-GRNDCLMP-nn,
are available.
7 Nameplate Power module and LCL filter module nameplate locations