BEFORE YOU BEGIN
Review the flowchart shown in Figure 2-3 before you begin installing
the Level Controller. This flowchart summarizes the tasks you should
complete to ensure a successful installation.
FIGURE 2-3. Level Controller
Installation Flowchart.
A
B
B
START
A
B
Unpack the Level
Controller
Review the Level
Controller Product
Manual
Bench
Configure
?
BENCH
CONFIGURE
(page 2-7)
Connect Bench
Power Supply
Connect
Model 275
(Page A-5)
Complete
Configuration
Tasks
(Section 3)
FIELD
INSTALLATION
(page 2-19
Review Installation
Considerations
Mount
Controller
Make Process
Connections
DONE
Yes
No
Tune the Loop
Controller
Configured
?
No
Complete
Configuration
Tasks
(Section 3)
Yes
Check for Leaks
(Optional) Install
RTD Assembly
Ensure jumper is
across output
terminals
Remove jumper
from output
terminals
Complete Wiring
Perform a
Level Trim