Introduction 7
Table 1-1 Measured Quantities and Sensed Signals
Measurement Mode Usage/output
Parameter Real-
time
Sliding
average
Demand Min/
Max
Display Commu-
nications
Analog
output
Pulse Data
logging
Trigger
setpoint
High kVA Á
High power factor lag Á
High power factor lead Á
High voltage THD Â
High current THD
High K-Factor
Demands
Volt demand per phase À
Ã
Ampere demand per phase
Ã
Total kW demand (block interval,
sliding window, thermal)
Ã
Total kvar demand (block interval,
sliding window, thermal)
Ã
Total kVA demand (block interval,
sliding window, thermal)
Ã
Predicted demands
Total kW demand (accumulated,
sliding window)
Total kvar demand (accumulated,
sliding window)
Total kVA demand (accumulated,
sliding window)
Total energies
kWh (import, export, net, total)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Satec System 295 and is the answer not in the manual?

Satec System 295 Specifications

General IconGeneral
BrandSatec
ModelSystem 295
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals