ERECTION AND DISMANTLING
28
V23C_09.13
SC4000 Pos 4
4.6.2. SC4000 TWIN
NOTE!
PREPARATORY WORKS THAT
SHOULD BE DONE BEFORE ERECT-
ING THE PLATFORM! SEE 4.4.
Drawing 4.21. SC4000 twin.
!
13-0994-103-1
15. Carry out the further assembly of the
mast.
If not freestanding, pay attention to
the anchoring instructions (4.5).
16. Fasten the counter part of the top
limit switch to the second last mast
section and assemble the mast top
cap.
17. Clean and grease the rack (see the
lubrication instructions chapter 6.).
18.
Assemble the mast guard around
the mast.
19. Platform can be taken into use rst
after technical inspection. This in-
spection should be carried out by
an authorized inspector. See 4.7.
20.
The mast sections can be assem-
bled on each other by using the
mast assembly crane (see op tional
equipment, chapter 2.).
Remember that the crane is meant
for handling the mast sections
only.
When you drive platform up or
down the crane has to be turned
to the side.
In normal use of the platform the
mast section assembly crane has to
be removed.
00-0693-50-1
1. Erect the masts on well pre pared
base at a suitable dis tance of the
wall. The suitable distance be tween
the machines and the wall is approx.
150-250 mm.