ERECTION AND DISMANTLING
5
SC4000 Pos 4
V23C_09.13
The preparatory works to be carried out:
• Fence the site where you erect the plat form with the information and warning
signs according to the local work and safety rules, laws and regu lations.
• Prepare the base for the platform.
The base must be at and horizontally levelled. Disturbed ground should be
rammed in order to prevent non-uniform settlement.
• Always use wooden ground plates un der the jacks.
NOTE!
MAX. JACK LOAD IS 60 kN/OUTRIGGER.
4.4. PREPARATORY WORKS
!
• Check drop-offs, holes, bumps, oor ob structions, debris and hazardous
locations.
• Check overhead obstructions and high voltage conductors.
• Check wind and weather conditions.
• Check attachments. Prevent the access of un au thorized persons to the
working place and pay attention to the trafc.
!!
WARNING!
The tightening torque for all screws in section joints is 350 Nm.
Check the torque of the screw connections before bolting on
the next mast.