SERVICE INSTRUCTIONS
5
SC4000 Pos 6
V23C_09.13
CHECK THE FOLLOWING POINTS 27-35 AND FILL UP THE
FREQUENT INSPECTION FORM (CHAPTER 10)
6.2.2. FREQUENT INSPECTIONS
6.2.2.1. WEEKLY INSPECTION
CHECK THE FOLLOWING POINTS 20-26 AND FILL UP THE
FREQUENT INSPECTION FORM (CHAPTER 10)
Drawing 6.2. Fre quent
inspection form
NOTE:
THE DAILY INSPECTION (POINTS 1-19)
SHOULD ALSO BE CARRIED OUT.
6.2.2.2. MONTHLY INSPECTION
27. Check the tightening of the mast section screws - 350 Nm.
28. Check the tightening of the platform section screws
-195 Nm.
29. Check the tightening of the lifting gear to the assembly
plate - 195 Nm.
30. Check the tightening of the safety brake to the assem bly
plate - 135 Nm.
31. Check the tightening of the assembly plate to the lifting
frame - 100 Nm.
32.Check the condition of conductors in the electric boxes.
Check also me chanical damages.*
Drawing 6.3.
Frequent inspection
form.
NOTE:
DAILY AND WEEKLY INSPECTIONS, POINTS 1-26
SHOULD ALSO BE CARRIED OUT.
*) The main switch Q0 and Q1 has to be switched to 0-position before opening the
electric centre.
!
!
33.Checktheconditionoftheelectricinstallationconnectionsintheelectricboxes
and tighten them if necessary.*
34. Check the tightening of the wheel nuts -100 Nm.
Check also the wheel pressure -4,5 bar.
35. Perform lubrications shown on the platform lubrication schedule (6.3.4)
for every 120 hours of operation.
20. Check the condition of the rack and the pinion.
21. Clean the guiding rollers.
22. Check the condition of the welded joints.
23. Check the possible oil leaks.
24. Check the screwed joints of the anchoring.
25. Perform lubrications shown on platform lubrication
schedule (6.3.4) for every 30 hours of operation.
26. Checktheconditionoftheproletubesofplatform
sections and basic platform