EasyManua.ls Logo

SCANCLIMBER SC4000 - Control Instructions: Lifting; Lowering

SCANCLIMBER SC4000
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
OPERATIONAL INSTRUCTIONS
V23C_09.13
SC4000 Pos 5
Preparation for control
MAST LOAD PLATFORM LENGTH PERSONS
1200 kg 12,5 m Max. 3 persons
SINGLE 1400 kg 10,5 m on the platform
1700 kg 7,4 m
2000 kg 4,2 m
2065 kg 31,4 m Max. 4 persons
TWIN 2680 kg 24,7 m on the platform
3500 kg 18,3 m
4200 kg 11,9 m
5.3. CONTROL INSTRUCTIONS
5.3.1. LIFTING / LOWERING
Control of the platform
- use hooter push-button S2 on the platform electric box before starting
- the platform is driven up or down by pushing the up or down button S4, S5
on the pendant controller or S7, S8 on the platform electric box OP2.
- connect the supply cable to the socket X1 on the chassis electric box
- switch on the main switch Q1 of the chassis electric box
- switch on the main switch Q2 of the platform electric box
- load the platform evenly, following the max. loading table:
Platform driving control can be
realised by:
a) using the drive buttons S7, S8 locat-
ed on the platform electric box OP2,
- connect the special plug X5.1 to the
socket -X5
0
-Q2.1
-S2
-Q2
-A1
option:
thermostat
-E1/-E2
+OP2
-P1
-X5
-X22
-XS7
-X8
9999h
1
-H3
Option:
drive hour
meter
-S7
-S1
-S8
STOP
E
M
E
R
G
E
N
C
Y
Drawing 5.5 Platform driving control re-
alised by the drive buttons located on
the platform electric box + OP2

Table of Contents