EasyManua.ls Logo

SCANCLIMBER SC4000 - Transfer with Chassis Drive Unit

SCANCLIMBER SC4000
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
OPERATIONAL INSTRUCTIONS
V23C_09.13
SC4000 Pos 5
The transfer to the following work site can be done with platform lowered down to
its transport position and with max. 2 mast sections. The transfer can be achieved
by 2 persons.
Following steps have to be done:
5.3 2. TRANSFER WITH CHASSIS DRIVE UNIT
S4 - PUSH-BUTTON - FORWARD
S5 - PUSH-BUTTON-REWARD
S6 - EMERGENCY STOP
X6 - PLUG
Q1 - MAIN SWITCH
X1 - SUPPLY SOCKET
X3 - SOCKET
Drawing 5.7. Pendant control E3
(horizontal/vertical drive).
-X1
-X3
+OP1
-Q1
-X6
+E3
-S6
-S4
-S5
.
Lower the platform on the rub-
ber buffers by manual lowering.
Put the clutch lever to horizon-
tal drive position. Note that the
chassis has no brakes when the
clutch lever is in towing position.
Turn the outriggers out.
Keep the jacks as near the
ground as possible.
LEVER POSITIONS
HORIZONTAL DRIVE
TOWING
Connect the pendant controller
to the chassis electric box con-
nector X3.
Connect the power supply ca-
ble to chassis electric box socket
X1.
Turn the chassis electric box
main switch Q1 to position 1.
The platform moves forward
pushing the up-button S4 and
backwards pushing the down-
button S5 on pendant controller
E3.
The chassis is steered by the tow-
ing bar.
After relocation:
Turn the outriggers out.
Lower the jacks.
The lower safety limit shall be by-
passed when lifting the platform
from rubber buffers. The bypass
switch is in the platform electric
box.

Table of Contents