ERECTION AND DISMANTLING
3
SC4000 Pos 4
V23C_09.13
4. ERECTION AND DISMANTLING
SC4000 mast climbing work platform has been designed with intention of
its easy and quick assembly. Partial assem bly, that should be checked
before taking the Scanclimber into use:
1.
the assembly of the chassis
2. the screwing of the rst mast section
3. the assembly of the lifting mechanism
4. the assembly of the main platform
5. the assembly of the limit switch counter parts
6.
the assembly of the limit switches
Mast sections, platform sections and wall anchors must be installed
according to the instructions given in the manual.
Screw and wrench Object
1. B: M24-10.9 to connect the mast sections
W: 36 mm
2. B: M18 x 240-10.9 to connect the platform sections with
W: 24 mm each other
3. W: 19 mm wall anchor coupler
4. B: M20-8.8 xing anged nuts of wall anchor
W: 30 mm tubes
5. B: M8 to connect the signalling bar and
W: 13 mm limit switch counter parts to the mast
section, to fasten the mast guard nets
4.1. INTRODUCTORY NOTES
4.2. REQUIRED TOOLS
B = Screw W = Wrench x) = Delivery with the stand ard unit