EasyManua.ls Logo

Servomex 2500 Series User Manual

Servomex 2500 Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Servomex 2500 Series
Process Gas Analysers
Installation Manual
Ref:02500/005C/2
Order as part 02500005C

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Servomex 2500 Series and is the answer not in the manual?

Servomex 2500 Series Specifications

General IconGeneral
TechnologyParamagnetic
Measurement Range0-100% O2
Operating Temperature-20°C to +50°C
Power Supply24V DC
Output Signal4-20 mA
MountingWall mount

Summary

SECTION 2 INSTALLATION – GENERAL

2.2.2 Safety Precautions

Highlights critical safety measures to be observed during installation.

2.3 Electrical Connections

Specifies requirements and procedures for making electrical connections to the analyser.

2.4 Installation

Covers the physical placement and mounting of the analyser.

2.5 Instructions Specific to Hazardous Area Installations

Outlines critical instructions for installing the analyser in hazardous environments.

2.6 ATEX Label Information

Explains the meaning and significance of ATEX certification labels on the equipment.

SECTION 3 INSTALLATION – ELECTRICAL

3.1 Electrical Power Connections

Details the procedures for connecting the analyser to the main electrical power supply.

3.2 Signal Connections

Covers the procedures for connecting various signal and communication cables.

3.2.1 Analogue Outputs

Describes how to connect and configure the analogue output signals from the analyser.

3.2.2 Analogue Output Link Selections on Sensor Interface Board (SIB) PCB

Explains how to configure analogue outputs using hardware link selections.

3.3 Control Connections

Covers connections for external control inputs and functions.

3.4 Digital Connections

Covers digital communication interface connections.

SECTION 4 INSTALLATION GAS CONNECTIONS

4.1 Purge Connections (EU1)

Details the connection of purge systems required for EU1 variants in hazardous areas.

4.1.1 General Purge Connections

Provides general guidelines for making purge gas connections for EU1 versions.

4.2 End Boss Purge Connection

Explains the connection of purge lines to the sample cell end bosses.

4.2.4 End Boss Purge

Outlines the procedure for purging the end bosses with inert gas.

4.4 Process Stream Connection

Details the connection of the process sample stream to the analyser.

4.5 Power-Up

Guides the user through the initial power-up sequence of the analyser.

SECTION 5 FAULT DIAGNOSIS AND CELL MAINTENANCE

5.2 Diagnostics

Explains how to access and interpret diagnostic information for troubleshooting.

5.3 General Fault Conditions

Lists common fault messages and their potential causes and solutions.

5.4 Serious Fault (Shutdown) Conditions

Details critical faults that cause the analyser to shut down and require immediate action.

5.5 Cell Maintenance

Provides instructions for cleaning and maintaining the analyser's sample cell.

SECTION 6 SPARES LISTS

6.2 Recommended Spares

Provides recommendations for spare parts quantities based on the number of analysers.

SECTION 7 INSTRUMENT SPECIFICATIONS

7.1.4 Performance Characteristics (each component)

Details performance metrics like error, repeatability, and response time.

SECTION 8 CE MARKING AND OTHER SAFETY APPROVALS

8.4 ATEX Directive and other non-European Hazardous Area approvals

Details ATEX and other hazardous area certifications for analyser variants.

Related product manuals