Shini Group
Technology & Marketing Dept
Issued by department: Date: Language: Document Name: Revision: Page:
Shini/CSC-TM
2013-11 zh-cn Shini product repair manual.doc
1.0 49 (62)
Catalog:
template:Standard_CN.dot; filename: Shini product repair manual; Printdate: 8/1/2014 1:58:00 PM; savedate: 8/1/2014 1:58:00 PM
10. Lead wire pull up (to prevent wire block), and press down with two thumbs in the
same time, four buckle must have fastened.
Pic 16-19
11. Use a screwdriver to push the ends of the reed in place.
Pic 16-20