Installation
46/121 Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DJH • 500-8067.9
Installation
11 Transport and storage
11.1 Unloading and transport to place of installation
➭ Attach ropes far away on the hoisting tackle. The ropes must not exert any force on the
panel walls under load.
➭ Sling the ropes around the ends of the wooden pallets.
➭ During transport to the place of installation or storage place, leave the panels on their
transport base for as long as possible.
➭ Set down the transport units close to the place of installation or storage place.
➭ Observe the installation order of the panels during transport to the switchgear room; leave
space for moving and mounting.
➭ Remove the packing close to the place of installation of the panels, and not before
beginning the installation process.
ATTENTION
Non-observance of the following instructions can endanger people or damage the transport
units while unloading.
➭ Make sure that nobody is standing in the swinging area of lifted switchgear.
➭ Attach ropes far enough on the hoisting tackle so that they cannot exert any forces on the
panel walls under load.
➭ Observe the dimensions and weights of the transport unit (delivery note).
➭ Observe even weight distribution and the high center of gravity of the switchgear.
➭ Ensure that the lifting tools and transport gear used meet the requirements as regards
construction and load-bearing capacity.
➭ Do not climb onto the roof of the panels.
➭ If the low-voltage compartment is removed, do not step on the mounting plates of the
low-voltage compartment.
➭ Observe the instructions on the packing.
➭ Unload the transport units in packed condition and leave packed for as long as possible.
➭ Do not damage the PE protective foil.