EasyManua.ls Logo

Siemens Simatic box pc 627b - Application Planning; Transport; Unpacking and Checking the Delivery Unit

Siemens Simatic box pc 627b
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIMATIC Box PC 627
Operating Instructions, Release 05/2006, A5E00362052-03
4-1
Application Planning
4
4.1 4.1 Transport
Despite the device's rugged design, its internal components are sensitive to severe
vibrations or shock. You must therefore protect the PC from severe mechanical stress when
transporting it.
You should always use the original packaging for shipping and transporting the device.
Caution
Risk of damage to the device!
When transporting the PC in cold weather, it may be submitted to extreme variations in
temperature. In this situation, ensure that no moisture (condensation) develops on or inside
the device.
If condensation develops, wait at least 12 hours before switching on the device.
4.2 4.2 Unpacking and checking the delivery unit
Unpacking the device
Note the following points when you unpack the unit
It is advisable not to dispose of the original packing material. Keep it in case you have to
transport the unit again.
Please keep the documentation in a safe place. It is required for initial commissioning and
is part of the device.
Check the delivery unit for any visible transport damage.
Verify that the shipment contains the complete unit and your separately ordered
accessories. Please inform your local dealer of any disagreements or transport damages.

Table of Contents

Related product manuals