Assignment planning
3.6 Configuring the electrical structure
ET 200M
52 Operating Instructions, 12/2008, EWA-4NEB780600602-08
ET 200M in the overall configuration
The following figure shows the position of the ET 200M in the overall configuration (load
power supply and grounding concept) with a supply from a TN-S-network.
Note: The arrangement shown of the supply connections does not correspond to the actual
arrangement; it has been chosen for reasons of clarity.





$&
$&
$&
'&
$&
'&

w3
1
0
/
/
0
36
60)0
,0[
/
/
/
1
3(
/RZYROWDJHGLVWULEXWLRQ
716V\VWHP[9IRUH[DPSOH
0RXQWLQJUDLO
&DELQHW
6PRGXOHV
*URXQGLQJEXVEDULQFDELQHW
/RDGFLUFXLW
$&WR9IRU$&PRGXOHV
/RDGFLUFXLW'&WR9IRU
LVRODWHG'&PRGXOHV
/RDGFLUFXLW'&WR9IRU
LVRODWHG'&PRGXOHV
Figure 3-10 Operating S7-300 modules from grounded supply