Service and maintenance
7.1 Behaviour of the Inverter when replacing components
SINAMICS G110D
198 Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
Replacing different components or version
If you replace different components with different software releases, then the Inverter must
always be re-commissioned.
Questions that can arise in conjunction with replacing components:
● How do I create a valid parameter set?
When commissioning, you can create a valid parameter set either using the
commissioning software STARTER or using the IOP.
● Which options are available for saving a valid parameter set? You can save a valid
parameter set either on the memory card or on the computer that you use for
commissioning with STARTER.
● How do I load a valid parameter set into my frequency inverter?
From the memory card when the frequency inverter is powered-up or by manually
downloading a parameters set either from the memory card or from the PC.