Connection
4
4.1
Procedure for installing the Inverter
Prerequisites for installing the Inverter
Before you install the Inverter, check that the following preconditions are fulfilled:
Are the ambient conditions permissible?
Are the components required for the installation available?
Are all the necessary tools and spare parts available?
Have the cables and wires been routed in accordance with the applicable regulations?
Do the minimum distances from other equipment comply with the specifications?
Installation procedure
Using the information from the drill pattern, mark the necessary fixing points for the
Inverter onto the area on which the Inverter is to be mounted.
Ensure that the correct orientation of the Inverter is observed.
Ensure that the ambient operating conditions are observed.
Ensure that the correct fuse protection is installed.
Install the memory card holder and memory card if required.
Construct the necessary cables (in accordance to the information provided).
Connect the AS-i cable to the AS-i bus.
For commissioning, connect either the IOP Hand-held Kit or a PC utilizing the STARTER
software and the optical cables.
The installation is now completed and the commissioning of the Inverter can now
commence.