Advanced commissioning
7.8 Application-specific functions
Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
239
4. Select process variables of the technology controller
5. Adapting to the line supply
The inverter signals that offline,
other units and process vari
a
bles
are set than in the inverter itself.
Accept these settings in the i
n-
ter.
You have changed over the units.