Commissioning
5.4 Basic commissioning with a PC
Converter with control units CU250D-2
74 Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
Carry-out basic commissioning
Procedure
Proceed as follows to carry out basic commissioning:
See also Section: Introduction, V/f control, vector control (Page 62)
Select the I/O configuration
to preassign the inverter interfaces.
The possible configurations can be found in sections:
Factory settings
of the inputs and outputs
(Page 51) and Default settings of inputs and
Set the applicable motor standard and the inverter supply voltage.
Select the application for the inverter.
"[0] Load cycle with high overload for applications requiring a high
dynamic performance, e.g. conveyor systems.
"[1] Load cycle with low overload ..." for applications that do not
require a high dynamic performance, e.g. pumps or fans.
[6], [7]: Load cycles for applications with encoderless 1FK7
synchronous motors.
Enter the motor data according to the rating plate of your motor.
e selected a motor based on its article number, the data has
Set the most important parameters to suit your application.