Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
59
Commissioning
5
5.1
Commissioning guidelines
The converter must match the motor and the drive application to be able to optimally operate
and protect the motor. We recommend a certain procedure when commissioning your
converter.
Explanation of the commissioning steps:
Preparing for commissioning
(Page 60)
Res
toring the factory setting
(Page 82)
Basic commissioning with
STARTER
(Page 69) orOperator
Panel (Page 65)
Adapt inputs and outputs
(Page 115)
Adapt fieldbus configuration
(Page 87)
Mo
tor control (Page 143)
Basic positioner and position co
ntrol
(Page 163)
Advanced commissioning
(Page 113)
Backing up data and series co
m-
missioning (Page 275)