Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
59
The converter must match the motor and the drive application to be able to optimally operate
and protect the motor. We recommend a certain procedure when commissioning your
converter.
Explanation of the commissioning steps:
Preparing for commissioning
②
toring the factory setting
Basic commissioning with
STARTER
(Page 69) orOperator
④
⑤
Adapt fieldbus configuration
tor control (Page 143)
⑦
Basic positioner and position co
ntrol
⑨
Backing up data and series co
m-