EasyManua.ls Logo

Siemens SINAMICS G120D - Page 290

Siemens SINAMICS G120D
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Backing up data and series commissioning
8.5 Write and know-how protection
Converter with control units CU250D-2
290 Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
Actions that are possible during active know-how protection
Restoring factory settings
Acknowledging messages
Displaying messages
Show message history
Reading out diagnostic buffer
Switching to the control panel (complete control panel functionality: Fetch master control,
all buttons and setting parameters)
Upload (only parameters that are accessible even though know-how protection is active)
The individual parameters that are excluded from the know-how protection can be found in
the List Manual in Chapter "Parameters for write protection and protection of know-how".
Commissioning the converter with know-how protection
Procedure - overview
1. Commission the converter.
2. Create the exception list (Page 293).
3. Activate the know-how protection (Page 291).
4. Save the settings in the converter by copying RAM to ROM with
or via p0971 = 1.
5. Save the project with on the PG/PC. Also back up any other project-related data
(machine type, password, etc.) that may be required for the support of the end customer.

Table of Contents

Other manuals for Siemens SINAMICS G120D

Related product manuals