Commissioning
5.4 Basic commissioning with a PC
Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
77
9.
Select the encoder that you use for position sensing.
10.
You may skip this screen initially. The settings are explained in the co
n-
text of commissioning of the basic positioner in the section:
Basic posi-
tioner and position control
(Page 163).
11.
Set the check mark for "RAM to
ROM (save data in the drive)" to save
your data in the inverter so that it is not lost when the power fails.
12.
Click "Finish" to complete the basic commissio
ning.
You have entered all of the data that is necessary for the basic commissioning of your
inverter.