EasyManua.ls Logo

Siemens SINAMICS S120 - Commissioning the SH and SBC Functions; General Information about Commissioning Safety Functions

Siemens SINAMICS S120
294 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SINAMICS Safety Integrated (Booksize)
Commissioning the “SH” and “SBC” functions
5-162
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
5.4 Commissioning the “SH” and “SBC” functions
5.4.1 General information about commissioning safety functions
Commissioning notes
!
Caution
For safety reasons, Safety Integrated must be commissioned using STARTER in
online mode.
Reason:
STARTER should only be used to store the safety parameters of a project
monitoring channel. As a result, downloading a project with active Safety
Integrated results in safety problems.
What to do if you download a project when Safety Integrated is active:
S Switch to online mode and compare the safety parameters between the two
monitoring channels in safety commissioning mode.
S Exit safety commissioning mode.
S Switch the power on.

Table of Contents

Other manuals for Siemens SINAMICS S120

Related product manuals