Commissioning
Initial commissioning using vector (booksize) as an example
3-59
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
STARTER diagnosis options
Under “Component” –> Diagnosis –> Control/status words
S Control/status words
S Parameter status
S Missing enable signals
3.5 Initial commissioning using vector (booksize) as an
example
The commissioning example described in this section shows all the necessary con-
figuration and parameter settings and testing routines. The commissioning proce-
dure is performed using the STARTER commissioning tool.
Requirements for commissioning
1. The commissioning requirements have been met.
–> see Section 2.1
2. The checklist for commissioning has been completed and all items are O.K.
–> see Section 2.2
3. STARTER is installed and ready to run.
–> see the “read me” file on the STARTER installation CD.
4. The electronics power supply (24 V DC) is switched on.
3.5.1 Task
1. Commission a drive system with the following components:
Table 3-6 Component overview
Designation
Component Order number
Closed-loop control and infeed
Control Unit Control Unit 320 6SL3040-0MA00-0AAx
Smart Line Module Smart Line Module 10 kW 6SL3130-6AE21-0AAx
Line filter package 10 kW Line filter and line reactor 6SL3130-0GE21-0AAx
Drive 1
Motor Module Single Motor Module 5 A 6SL3120-1TE15-0AAx
Motor Induction motor 1LA
Drive 2
Motor Module Single Motor Module 5 A 6SL3120-1TE15-0AAx
Motor Induction motor 1LA
2. The enable signals for the infeed and drive are to be transmitted via terminals.