Commissioning
Initial commissioning using vector (booksize) as an example
3-61
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
3.5.3 Signal flow for commissioning example
Motor Module 2
– IBN –
87654321
IBN_Vektor_bico1.vsd
SINAMICS
04.03.03
Signal flow from initial commissioning example (chassis)
+
+
M
M
X124.4
X124.3
24 V
external
DI 0
DI 1
DI 2
DI 3
Enables
Motor
Modules
X124.2
X124.2
DI4
X132.1
X122.1
X122.2
X122.3
X122.4
p0852 = 0722.3
p0848 = 0722.2
p0844 = 0722.1
p0840 = 0722.0
r0722.4
r0722.0
r0722.1
r0722.2
r0722.3
0 = OFF3
Operation enabled
0 = OFF2
0 = OFF1
Vector V/f 1
M
~
Speed
controller
Ramp-up
encoder
p1140 p1142
p1141
each 1 = enable
p0864 = 0722.4
+
L1
L2
L3
[2120]
[3060]
[2501]
[2610]
[2100]
[xxxx]: Function diagram number
p1070
Setpoint
channel
[3030]
Motor Module 1
Smart Line Module
r1024
p1001[D]
0.000 0 0 0 0
0 0 0 1
p1020 = 0722.7r0722.7
p1021 = 0
p1022 = 0
p1023 = 0
Fixed setpoints
[3010]
Fixed setpoint
Selection
DI 7
X132.4
Vector V/f 2
M
~
Line connection
24 V
X21.1
Ready
Fig. 3-6 Signal flow for initial commissioning example (booksize; vector)