EasyManua.ls Logo

Siemens SINAMICS S120 - Page 193

Siemens SINAMICS S120
294 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Diagnosis
Diagnostics using LEDs
6-193
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition
Table 6-2 Control Unit 320 – description of the LEDs after booting, continued
LED RemedyDescription, causeStatusColor
OFF
Cyclic communication has not (yet) taken place.
Note:
PROFIBUS is ready for communication when the
Control Unit is ready (see LED RDY).
-
DP1
(PROFIBUS
Continuous Cyclic communication is taking place. -
(PROFIBUS
cyclic
operation)
Green Flashing
0.5 Hz
Full cyclic communication is not yet taking place.
Possible causes:
S The master is not transmitting setpoints.
S No global control (GC) or master sign-of-life is
transmitted during isochronous operation.
-
Red Continuous Cyclic communication has been interrupted. Remedy fault
OPT
OFF
Electronics power supply is missing or outside
permissible tolerance range.
Module is not ready.
Option board not installed or no associated drive
object has been created.
-
OPT
(OPTION)
Continuous Option board is ready. -
(OPTION)
Green Flashing
0.5 Hz
Depends on the option board used. -
Red Continuous
At least one fault is present in this module.
Option board not ready (e.g. after power-on).
Remedy and
acknowledge
fault
MOD
OFF Reserved -
MOD
Green Continuous Reserved -

Table of Contents

Other manuals for Siemens SINAMICS S120

Related product manuals