EasyManua.ls Logo

Siemens siprotec 7SA522 - Page 29

Siemens siprotec 7SA522
628 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Introduction
1-97SA522 Manual
C53000-G1176-C119-2
High Current Fast
Switch-on-to-Fault
Protection
fast tripping for switch-on-to-fault conditions;
selectable for manual closure or following each closure of the circuit breaker;
with integrated line energization detection.
Automatic
reclosure
(optional)
for reclosure after single-pole, three-pole or single and three-pole tripping;
single or multiple reclosure (up to 8 reclosure attempts);
with separate action times for every reclosure attempt, optionally without action
times;
with separate dead times after single-pole and three-pole tripping, separate for the
first four reclosure attempts;
controlled optionally by protection start with separate dead times after single, two
and three-pole starting
Synchronism and
voltage check
(dead-line / dead-
bus check)
(optional)
checking synchronization conditions before reclosure after three-pole switching;
fast measuring of voltage difference U diff of the phase angle difference
ϕ diff and
the frequency difference f diff;
alternative check of dead-line / dead-bus before reclosure;
switching under asynchronous network conditions with advance calculation of the
synchro-time possible;
adjustable minimum and maximum voltage;
check synchronism or dead-line / dead-bus also before manual closure of the circuit
breaker possible, with separate limit values;
measurement via transformer also possible;
measuring voltages optionally phase-phase or phase-earth
Overvoltage
Protection
(optional)
Overvoltage detection of each phase-earth voltage with common time delay;
separate measuring system with a separate time delay, for the zero sequence volt-
age, or any other single-phase voltage;
the reset ratio of the single-phase (zero sequence) voltage protection can be set;
command transfer to the remote line end is possible.
Fault Location Initiated by trip command or reset of the fault detection;
computation of the distance to fault with dedicated measured value registers;
fault location output in ohm, kilometers or miles and % of line length;
parallel line compensation can be selected;
load compensation available.
Circuit breaker
failure protection
(optional)
with independent current stages for monitoring current flow through every pole of
the circuit breaker;
with independent monitoring time steps for single-pole and three-pole tripping;
start by trip command of every internal protection function;
start by external trip functions possible;

Table of Contents

Other manuals for Siemens siprotec 7SA522

Related product manuals