EasyManua.ls Logo

Siemens siprotec 7SA522 - Initial Inspections

Siemens siprotec 7SA522
628 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-17SA522 Manual
C53000-G1176-C119-2
Initial Inspections 3
This Chapter describes the first steps that should be taken upon receiving the
SIPROTEC
®
4 7SA522.
Unpacking and re-packing is explained.
Visual and electrical checks that are appropriate for initial inspection are discussed.
The electrical tests include navigating through the operating menus of the device us-
ing the operator control panel on the front of the device, and the operator control win-
dows in DIGSI
®
4. For personnel inexperienced with the 7SA522, these checks also
provide a quick and simple method for understanding the operation of the control pan-
el and DIGSI
®
4. The electrical tests can be done without measuring quantities being
applied.
Observations relevant to long-term storage of the device are noted.
3.1 Unpacking and Re-packing 3-2
3.2 Inspections upon Receipt 3-3
3.3 User Interface 3-5
3.4 Storage 3-13

Table of Contents

Other manuals for Siemens siprotec 7SA522

Related product manuals