Installing/Mounting
2.2 F US Clamp-on Communications Module Installation
F US Clamp-on Communications Protocol Manual
Hardware Installation Manual, 11/2015, A5E34981613-AC
11
New Communications Module Installation
This installation procedure is for flowmeters with an I/O Module installed but no Modbus
Communications Module previously installed. Mounting kits are also required for this
installation.
Table 2- 1 Mounting Kit
1015N-5M-MK3 1010MN 1010N-8M I/O Module with
1010N-2M Module installed
1. Disconnect power to the unit.
2. Open the flowmeter cover by releasing the side cover latch
③.
3. Loosen the I/O Module cover captive screw
② and remove the cover, screw and
standoff.
I/O Module cover, cover screw,
I/O Module
I/O Module captive mounting screws
Figure 2-1 New Communications Module Installation
4. Remove the four mounting screws and standoffs ⑥ that secure the I/O Module ⑤ and
discard.
5. Install the new standoffs supplied in the mounting kit in the vacant positions.